The Complete Guide to Design-Bid-Build Construction Projects

The Complete Guide to Design-Bid-Build Construction Projects

Design-bid-build (DBB) represents the most traditional and popular project delivery method across the construction industry. This sequential phasing balances coordinated planning with competitive transparency—ultimately enhancing client control over budget, timeline, and quality from start to finish.

If undertaking new commercial builds, residential housing developments, renovations, or other construction initiatives for the first time however, the methodology can seem complex to newcomers.

In this comprehensive guide, we’ll walk through design-bid-build from initial ideation all the way through owner occupancy, so you feel fully equipped collaborating on construction endeavors of any scale. Let’s get started!

In this blog, we will discuss important topics about the complete guide to design-bid-build construction projects including:

  • Starting a Construction Project for Buildings
  • Blueprinting Success with Detailed Construction Design Documents
  • Choosing the Right Contractor for Construction Projects
  • Efficient Steps in Building Construction
  • Understanding Inspection and Quality Assurance in Construction
  • Finishing Construction Projects Successfully
  • Understanding Challenges in Design-Bid-Build (DBB) Construction Projects
  • Insights for Successful Design-Bid-Build (DBB) Construction Projects
  • Why Choose Clipper Construction for Your Next Commercial Construction Project
  • Frequently Asked Questions (FAQs)

  • Check out: Tips When Choosing the Right Contractors for Your Commercial Construction Project


    Starting a Construction Project for Buildings

    Every new build or major renovation begins with the project initiation phase. This step sets the all-important groundwork guiding decisions throughout subsequent design, bidding and construction stages. To start off, it's important to clearly define some key things:

    • Intended building usage and classification
    • Overall budget targets and financing
    • Size specifications —square footage or units needed
    • High level site location and property plans
    • Target construction start and completion timeframe
    • Zoning laws, permitting requirements and utility access
    • Special features, finishes, or build specifications sought
    • Sustainability goals or certifications (LEED, etc.)
    • Technology integration objectives, access control and security specifics
    • Core tenant improvement needs or scope overview (for commercial space build outs)

    Having clear goals, knowing the budget, and understanding the rules sets a clear path before hiring architects and engineers. This also helps contractors understand the project better when they bid for the work. Design specifics can be refined progressively, but deciding the main purpose, function, and what's expected upfront helps avoid changing plans later.


    You’ll also want to assemble your core construction team including:

    Project managers organize different parts of the project and keep communication going. Some big companies have their own project managers, but you can also hire separate ones.

    Architects design aesthetics, spatial layouts, access plans based on intended usage and scope of work parameters. Frequency of meetings and availability throughout documentation and construction phases is key.

    Structural engineers check how much weight the building can take, how safe it is, and risks like earthquakes based on the soil in the area.

    MEP engineers handle intricate mechanical, electrical and plumbing infrastructure build outs linking lighting, HVAC, data, water systems.

    Environmental consultants look at ways to be more eco-friendly and save energy during the project.

    An experienced construction attorney can help make sure the contracts with designers and the main contractor are fair and clear.

    Lastly, having someone to represent the owner's interests, especially in big projects, can save money and keep things fair.

    Basically, every project stakeholder should be assembled before design work begins. This helps keep things smooth as the project goes on and stops problems when it's time to pick a contractor. Plus, it gives a good mix of opinions as plans change.


    Blueprinting Success with Detailed Construction Design Documents

    Now that your team of architects and engineers is ready, they'll start working on detailed plans based on the initial project groundwork. Construction drawings translate spatial layouts, physical structures, and MEP system requirements into highly detailed technical illustrations, serving as the construction team’s literal blueprint for the physical build. It is crucial for the construction team to understand exactly what needs to be done.

    Core design drawings include:

    • Site plans indicating existing conditions, demolition needs, proposed additions
    • Architectural designs marking interior programmed spaces, room sizes, door/window details
    • Structural plans depicting foundation requirements plus framing, roof, stair, finish specs
    • Mechanical drawings for HVAC equipment specs, ductwork routing, ventilation calcs
    • Electrical illustrations showing lighting plans, power, panels, low voltage details
    • Plumbing layouts covering fixtures, water supply lines, drains, pipe routing
    • Fire protection details including sprinklers, hydrant access, egress points
    • Telecom/technology plans for network, A/V layouts, security access specs

    Picking the right materials is also important. The materials need to work well, be easy to maintain, be good for the environment, look good, and be possible for the construction crews to use. Also, detailed site logistics plans indicate job site access points, trailer locations, temporary facilities, and phased work zones.

    The full building plans, material choices, project manual specs and bid packets represents “bid-ready construction documents”. As the label suggests, only completed documentation sets allow GCs (general contractors) to offer binding lump sum or cost-plus fee bids including detailed line-item breakdowns during the RFQ (request for quotation) phase. These documents show exactly what needs to be done and how much it will cost.

    The more detailed the plans are, the more accurate the cost estimates will be. Some clients rush the design process, asking for incomplete plans and promising to add details later. However, it's better to refine the plans until they're 100% complete. This saves money, avoids problems, and makes sure the building is safe in the long run.


    Choosing the Right Contractor for Construction Projects

    Now that finished designs meet scope needs, project parameters and local building codes, it’s time to secure a builder. The open bidding process is important as it brings transparency to the pricing and encourages fair competition among builders.

    The bid solicitation package, public notices and finalized documentation gets distributed to licensed contractors in the region. Companies then submit confidential RFQ (requests for quotation) including project cost breakdowns and construction timeline estimates.

    Builders get the information about the project, and they submit their quotes and estimates. But it's not just about comparing the prices they offer. You need to look at other things too:

    • Years in operation and evidence of financial stability
    • Insurance coverage limits protecting you from risk
    • Project safety track record measured in TRIR stats
    • Company performance record – what percentage of builds completed under original budget or timeline
    • Number and scale of similar project examples in recent years
    • Key subcontractor partners identified. Do proposed electricians, plumbers etc. show proven project collaborations or new random subs you can’t fully vet? This signals GC priorities on quality partnerships versus just lowballing key scopes.
    • Construction schedule viability including mobilization timing, milestones and personnel dedication.
    • Familiarity with green building practices if LEED or similar certifications are project goals
    • Software platforms utilized – Do field crews leverage online collaboration apps for managing plans, Punch lists, photo logs, inspections, transparent change orders in real time?
    • Past client references and testimonials to convey responsiveness, problem resolution success, communication clarity and more firsthand user experience factors

    It's also important to see if you get along well with them. Design-bid-build projects entail heavy collaboration between clients, designers and builders over months. Make sure your construction partner relationship makes you comfortable during stressful times, not on edge.

    Choosing a builder isn't just about finding the cheapest one. Putting more focus on saving money can lead to problems like missing deadlines or poor-quality work that might cost more to fix later. Check everything about each builder - their skills, how they handle changes, how quickly they respond - and choose the one that offers the best value for your specific project.


    Efficient Steps in Building Construction

    Once the contracts are signed, the building begins! The main builder, called the general contractor (GC), leads the actual building work based on the agreed plans. The GC manages personnel logistics like the organizing of the workers, daily schedules, inspections, site security, permits, equipment rentals and material deliveries.

    An experienced Project Manager keeps an eye on all these different parts of the project, while another person, like a superintendent or foreman, makes sure the workers are doing things safely and correctly every day.

    In commercial projects, the building usually happens like this:

    1. Mobilization of site logistics like temporary power, sanitary facilities, safety fencing/netting, container storage for tools and materials when no existing structures exist. Crew parking areas established.
    2. Demolition of existing structures if sites have prior improvements for repurposing. Asbestos abatement or special waste removal may apply as regulated processes requiring testing documentation.
    3. Site clearing, rough grading using earthwork equipment, soil compaction, erosion controls and foundation preps.
    4. Foundation work includes excavating for footing forms, steel rebar laying, concrete pours leveling the site. Testing verifies proper curing.
    5. Framing phase follows with wood or structural steel members comprising the new building bones erected per structural design specs.
    6. Roofing goes up along with initial exterior finish work if masonry, stucco, glass curtain walls are designed. Window installation follows.
    7. MEP rough ins route electrical, plumbing, HVAC systems throughout framed spaces guiding outlet placements, main system components, duct runs
    8. Insulation, drywall delivers conditioned interior air flow
    9. Flooring, cabinets, bath fixtures comprise detailed interior finish stage

    Each of these big steps has many small tasks that need to happen in the right order. For example, electricians can't do their work until the walls are up, and if something like the heating system is delayed, it can affect other jobs too. This shows how important it is to have experienced people overseeing the work to keep everything on track.


    Understanding Inspection and Quality Assurance in Construction

    Systematic project inspections are like checkpoints that make sure the building work meets the rules and is safe. Local building departments make sure the project follows zoning laws and safety codes at different stages, starting from the foundation to when people can move in.

    Milestones like framing, electrical, plumbing/ mechanicals and fire protection systems commonly require discrete inspection sign offs from city officials before proceeding. This helps make sure everything important for safety is done right away. Fixing mistakes later, like tearing down walls to fix things, costs a lot and messes up the budget.

    Another way to make sure things are going well is by having someone separate from the builders check the work. This third party makes sure that the work done by different workers matches what's been paid for. Finance managers can’t always visit sites frequently enough to monitor contractor invoices match on-site progress, change orders justify charges, etc. If there are disagreements about payments or if someone asks for money because of problems with the work, it can cause big problems and delays.


    Finishing Construction Projects Successfully

    As the final touches inside the building are completed, the main builders do thorough inspections with the clients, other workers, and sometimes city inspectors. They make a list of small things that need fixing, like scratches or adjustments to doors or machines, before the building is officially handed over. Workers make sure everything is perfect, so the building is ready to use without any problems, like it should be according to the contract.

    Only after final site inspections fully approve workmanship quality, cleaning, outdoor landscaping details and systems performance testing does the building department issue a Certificate of Occupancy. The CO will confirm your new commercial office tower, mixed use apartment complex or tenant build out meets all compliance requirements for the intended use and occupancy volumes. If not, the insurance costs can go up.

    With permitting paperwork now in place, clients conduct final furniture, IT systems, inventory and operational equipment move-in tasks. It's not just about finishing the construction, it's about creating a place that's made just for you and your needs, and it's expected to work well for many years, thanks to the smooth design-bid-build process.


    Understanding Challenges in Design-Bid-Build (DBB) Construction Projects

    Even though design-bid-build projects promise good quality and cost control, they come with risks that you should know about:

    Single Responsibility: You can only hold the main builder accountable for problems, not the individual workers they hire. Builders try to protect themselves with legal agreements with their workers.

    Rigid Plans: Once the contracts are signed, there's little room to change the plans or costs, unlike other methods where changes are easier. This can make it hard to improve things later without spending more money.

    Limited Design Feedback: Builders can't give many suggestions during the bidding stage, and sometimes, architects don't want to change their plans. This means valuable builder ideas might be ignored.

    Lowest Bid Issue: Often, contracts are given to the cheapest builder, which can lead to problems. Builders might cut corners or use tricks to save money, affecting the quality of the project. It's important to check if the builders are really good at their job.

    Market Changes: Sometimes, when the economy is growing fast, good workers are taken away from ongoing projects to work on new ones. This can raise costs or cause delays for existing projects.

    These problems lead to about 60% of projects facing challenges finishing DBB on time and within budget. But being aware of these risks helps in finding ways to deal with them smartly.


    Insights for Successful Design-Bid-Build (DBB) Construction Projects

    Even though there can be problems, design-bid-build remains a trusted way to get buildings done right. Many successful projects happen every year using this method. Here are some tips for success:

    1. Invest a lot of time upfront to clearly plan out your project goals, budget, and what you want before starting the design work. Being unclear can cause problems later.
    2. Closely collaborate with designers and engineers requesting constructability feedback from qualified builders during planning.
    3. Require 100% finished permit drawings before issuing bid requests. Gaps in the plans can cause trouble later.
    4. Look closely at the skills and experience of the builders, not just how much they'll charge.
    5. Maintain constant communication and oversight during the build. Transparency and accountability achieve results.
    6. Have someone else check the work to make sure it's following the rules and pay based on the progress made.
    7. Follow project management best practices for contingency planning, change process flows and master builder scheduling.

    By paying attention to planning, working together, checking the work, and following good steps at each stage, design-bid-build projects can finish with fewer problems and better results overall.


    Why Choose Clipper Construction for Your Next Commercial Construction Project

    Still have questions on the complexities of design-bid-build and how to avoid issues? The experienced project management professionals at Clipper Construction offer free consultations drawing from over decade years' experience taking commercial construction and renovations projects from concept to completion.

    We welcome the opportunity to discuss your next building visions answering questions about how things work, pricing unknowns or ways to strengthen project planning foundations as you look ahead to a hiring process.

    Whether you're starting a new building from scratch or giving an old property a fresh look, our approach focuses on clear plans, making sure contractors do what they're supposed to, watching quality closely, and fixing any issues swiftly. We aim to keep costs in check without compromising on top-notch workmanship.

    Contact us today at (443) 323-1880 or visit our website at https://www.clipper.construction/ to explore our expertise in construction. We're available from 6:00 am to 7:00 pm, Monday to Friday. Let's bring your visions to life, on time and within your budget!


    Frequently Asked Questions (FAQs)

    1. What are the key steps to start a construction project for buildings?
      Starting a construction project involves defining the building's purpose, setting budget targets, specifying size requirements, determining the site location, understanding zoning laws and permits, outlining sustainability goals, integrating technology needs, and assembling a comprehensive construction team.
    2. How important is it to assemble a comprehensive construction team before initiating the design process?
      Assembling a complete construction team before design work begins is crucial. It ensures smooth collaboration, avoids problems during later phases, and provides diverse opinions for better planning and execution.
    3. What are the essential components of detailed construction design documents for a building project?
      Detailed construction design documents include site plans, architectural, structural, mechanical, electrical, plumbing, and fire protection drawings. Material choices, logistics plans, and bid-ready documents are also vital.
    4. How do construction drawings and plans influence accurate cost estimates?
      Comprehensive construction drawings help in generating accurate cost estimates. The more detailed the plans, the more precise the cost estimates will be, ensuring fewer surprises during the construction phase.
    5. What criteria should be considered when choosing a contractor for construction projects?
      Factors such as years of operation, financial stability, safety track record, performance history, subcontractor partnerships, construction schedule viability, green building expertise, software utilization, and client references play crucial roles in selecting the right contractor.
    6. Why is it important to focus on value rather than just the cost when selecting a construction partner?
      Focusing on value ensures quality results and prevents issues like missed deadlines or poor-quality work. It's essential to evaluate a contractor's skills, adaptability to changes, responsiveness, and overall value offered for the project.
    7. What are the primary phases involved in the efficient construction of a building?
      Efficient construction typically involves mobilization, demolition (if necessary), site clearing, foundation work, framing, roofing, MEP installations, interior finish work, and final inspections. 
    8. How do systematic inspections and quality assurance impact the construction process?
      Systematic inspections ensure compliance with regulations and safety codes, avoiding costly mistakes and ensuring quality construction. Quality assurance procedures also involve third-party checks to verify work matches payments.
    9. What are the final steps to successfully finish a construction project?
      Final steps include thorough inspections, addressing minor fixes or adjustments, obtaining the Certificate of Occupancy, finalizing paperwork, and completing move-in tasks for furniture, equipment, and operational setups.
    10. What challenges are commonly associated with Design-Bid-Build (DBB) construction projects, and how can they be managed effectively?
      Challenges like single responsibility, rigid plans, limited design feedback, lowest bid issues, and market changes can be managed through meticulous planning, effective collaboration, detailed contract evaluation, constant communication, and contingency planning.

    Popular posts from this blog

    What to Look For in a Commercial Construction Contractor

    What are Ways of Managing Risks During the Construction Process?

    What are the Typical Stages of a Commercial Building Construction Project?